Get Access Audit
PRM • ADA • EN 16584 • Step-Free Boarding

RAIL ACCESS FOR EVERYONE EVERY STATION

Access Rail Solutions engineers ramps, lifts, gap-fillers and boarding systems that make trains truly accessible. We close the platform-train gap — physically, technically, humanly.

0Stations upgraded
0% PRM compliance
0Years on track
Railway tracks at sunset - accessible rail infrastructure
● LIVE DEPLOYMENTSEN 16584 Certified
Gap 76mm → 12mm
Auto boarding bridge active
♿ 2.4M+ assisted boardingsWheelchairs, strollers, luggage, bikes — no lift needed.
STEP-FREE BOARDING ✦ PRM RAMPS ✦ PLATFORM LIFTS ✦ GAP FILLERS ✦ TACTILE GUIDANCE ✦ AUDIO NAVIGATION ✦ STAFF TRAINING ✦ ACCESS AUDITS ✦ STEP-FREE BOARDING ✦ PRM RAMPS ✦ PLATFORM LIFTS ✦ GAP FILLERS ✦STEP-FREE BOARDING ✦ PRM RAMPS ✦ PLATFORM LIFTS ✦ GAP FILLERS ✦ TACTILE GUIDANCE ✦ AUDIO NAVIGATION ✦ STAFF TRAINING ✦ ACCESS AUDITS ✦ STEP-FREE BOARDING ✦ PRM RAMPS ✦ PLATFORM LIFTS ✦ GAP FILLERS ✦
01 — Who we are

ABOUT ACCESS RAIL SOLUTIONS

We started in 2012 with one folding ramp and a big frustration: 30% of passengers struggle to board. Today we deliver full-station accessibility ecosystems across commuter, metro, intercity and heritage rail.

Work with us
Accessible train station platform
Modern accessible trainRail accessibility engineering

We don't sell equipment. We remove barriers to independent travel.

Access Rail Solutions is a design-engineering studio + field crew for inclusive rail. We audit stations, prototype boarding aids, certify to ADA / PRM-TSI / EN standards, train staff, and maintain systems for 10+ years. Our mantra: if a 7-year-old, an 80-year-old with a walker, and a traveler with a suitcase can all board in under 20 seconds — we succeeded.

✓ PRM-TSI & ADA ready
Full compliance docs, risk assessments, testing protocols.
✓ 20-sec boarding
Manual + automatic ramps tested with 180kg loads.
✓ Retrofit, not rebuild
78% of our installs need zero platform reconstruction.
✓ Maintained for decade
24/7 monitoring, spare parts, annual recertification.

Our team includes former train conductors, wheelchair users, industrial designers and safety engineers. Every product is co-tested with disability advisory boards in real stations — rain, snow, rush hour included.

2012
First ramp
Folding PRM ramp for regional operator.
2017
Auto bridge
Patented auto gap-filler launched.
2021
120 stations
National rollout + lifts division.
2026
Access OS
Sensor platform + predictive maintenance.
02 — What we do

SERVICES THAT OPEN DOORS

From audit to daily operation — one partner for the whole accessibility journey.

Station accessibility audit
/ 01

Access Audits & Certification

Laser gap mapping, slope & lighting analysis, PRM-TSI / ADA gap reports with prioritized roadmap and budget.

Laser scanningCompliance report
Engineering boarding ramp
/ 02

Boarding System Engineering

Custom manual ramps, powered lifts, sliding steps and auto bridges matched to your fleet and platform heights.

PrototypingCrash-tested
Station construction installation
/ 03

Installation & Retrofit

Night-time installs with zero service interruption. Platform edge rebuilds, tactile paving, handrails, signage.

48h installZero downtime
Monitoring sensors maintenance
/ 04

Access OS Monitoring

IoT sensors track ramp cycles, lift health, gap width. Predictive alerts + dashboard for operators.

IoT24/7 support
Staff training inclusive service
/ 05

Staff Training & PRM Service

Hands-on assistance training, disability awareness, boarding drills with real wheelchair users as coaches.

CertifiedOn-site
Wayfinding tactile guidance
/ 06

Wayfinding & Info Access

Tactile maps, high-contrast signage, audio beacons, app navigation for blind and low-vision travelers.

BrailleAudio
0mm → 12mmAverage gap reduction
0 secAverage assisted boarding
0 kgTested load capacity
24/7Monitoring & response
03 — Product ecosystem

SYSTEMS BUILT FOR REAL GAPS

Modular hardware that fits 90% of fleets: low-floor, high-floor, heritage, metro.

Get catalogue
AR Bridge automatic gap filler
FLAGSHIP ★ AR-BRIDGE AUTO

Automatic boarding bridge

Deploys in 3 seconds on door open. Anti-slip, heated, 350kg capacity. Retrofit to existing doors without recertifying the car.

IP65-30° to +55°EN 16584
Portable PRM ramp bus train
LIGHTWEIGHT / 9 KG

SwiftFold PRM ramp

One-hand deploy carbon ramp. Visual + tactile edge, 800mm wide, fits under-seat storage. Loved by conductors.

9 kg800 mm5-year warranty
Platform lift station
VERTICAL / 3M LIFT

Platform micro-lift PL-3

Where elevators don't fit: 1.2×1.2m footprint, vandal-proof, battery backup for 40 cycles during blackout.

No pit neededVandal-proof
Tactile guidance and beacons
DIGITAL + PHYSICAL

GuideLine tactile + audio

Photoluminescent tactile strips + Bluetooth beacons that talk to phone: “Door 2, wheelchair space free.”

BLE beaconsNight-visible
04 — Proof on platforms

FEATURED PROJECTS

Northgate Central station upgrade
62 PLATFORMS • 11 MONTHS

Northgate Central — Full step-free

Auto bridges + 18 micro-lifts. Complaints -91%, dwell time -14 sec.

Replicate this →
Harbor Line heritage retrofit

Harbor Heritage Line — No-drill retrofit

★ Heritage award 2025
Metro night fleet upgrade

Metro Night Fleet — 240 cars in 30 nights

★ Zero cancelled services
05 — Answers

ACCESS FAQ

Straight answers for operators, architects and passenger advocates.

Rail team answering questions
Do we need to rebuild platforms? +
In 78% of cases, no. Our bridges and ramps compensate 80–320mm height differences and up to 120mm gaps. We laser-scan first and tell you honestly when civil works are unavoidable.
Are systems compliant with PRM-TSI / ADA? +
Yes. Every install ships with test reports, load certificates, slip resistance data and maintenance manuals accepted by national safety authorities.
How long does installation take? +
Manual ramps: 1 day. Auto bridges: 1 night per car. Micro-lifts: 48 hours. Full station (tactile + signage + lifts): 3–6 weeks with night shifts.
What about snow, rain, vandalism? +
Heated anti-ice surfaces, IP65 electronics, IK10 housings, and battery backup. We test at -30°C and in salt spray chambers.
Do you train our staff? +
Always. 2-day hands-on course with wheelchair-user trainers, plus annual refresh and video library. Certification included.
06 — Journal & updates

LATEST NEWS

Field notes, standards explained, and deployments. Click any story to read the full article.

All stories (1)
Iptv De Portugal
2026-10-27 00:37:39 • Featured

Iptv De Portugal

Access Rail Solutions and IPTV: Better Passenger Entertainment and Sports Viewing in Portugal Access Rail Solutions sits at the…

Read full story →
07 — Get started

GET YOUR FREE ACCESS AUDIT

Send us platform heights, fleet types and 3 photos. In 48h you get a gap map + budget estimate + compliance score.

  • ✦ Response in 24 hours
  • ✦ NDA-friendly, no obligation
  • ✦ On-site demo ramp available
Contact Access Rail Solutions
By sending, you agree to be contacted about accessibility solutions. No spam, ever.